Interior strip-out
Removal of finishes, equipment, partitions and defined elements, including handling and disposal.
DEMOLITION & ASBESTOS - STRIP-OUT, DEMOLITION AND CONTROLLED DELIVERY
CityPro defines strip-out, demolition, structural interfaces, waste streams and asbestos risk before execution. Where the applicable method requires an approved or listed asbestos contractor, removal is carried out by an operator authorised for that method.

SCOPE OF WORK
Demolition is treated as a technical package: areas, structural impact, services, waste, access and potential asbestos are checked before the affected works proceed.
Removal of finishes, equipment, partitions and defined elements, including handling and disposal.
Local demolition and openings defined by the project, with temporary support or structural instructions where required.
Organisation of waste streams, loading, transport and appropriate disposal channels for the validated scope.
Where asbestos is known or suspected, the inventory, removal method and applicable authorisations are checked before demolition in the affected area.
FIELD EVIDENCE
The visual evidence shows the actual site process: exposure, structure, preparation and transformation. A demolition photo does not replace an asbestos inventory or removal method.


PROJECT FIT
Areas and responsibilities must be sufficiently clear before work starts. Asbestos can change the method, programme, authorisations and required operator.
METHOD
Suspected asbestos is not treated as a standard demolition item. Method and operator are determined from the material, project file and applicable requirements.
Areas, drawings, any inventory and project constraints.
Separate standard removals, structural issues, waste and asbestos risk.
Targeted checks or specialist operators where the file requires them.
Works delivered to the validated scope with appropriate routes and operators.
PROJECT FILE
Tell us what must be removed, whether asbestos is known or suspected and which documents are already available.